EDA Construction Site Sign

  • The EDA-approved sign must be erected at the project location as soon as possible after construction begins. Evidence of this must be provided to the Regional Office Project Engineer (digital photos will suffice).
  • The DOC seal provided below is only for use by recipients of EDA awards on EDA-approved signage.
  • The space labeled “EDA Grant Recipient Name” on the EDA sign must be replaced by the actual name of the EDA Grant Recipient.
  • Below are some available files that can be provided to the contractor or sign-maker.